outdoor input in the building and each floor Low voltage(200/380VAC) industrial SPD
Product Details:
| Place of Origin: | Dongguan China | 
| Brand Name: | Uchi | 
| Certification: | CE / SGS / ISO9001 | 
| Model Number: | OBV-SPD-420V | 
Payment & Shipping Terms:
| Minimum Order Quantity: | 200 piece | 
|---|---|
| Price: | Negotiate | 
| Packaging Details: | export package / Negotiate | 
| Delivery Time: | 5-15 days after payment | 
| Payment Terms: | T/T, L/C, Western Union | 
| Supply Ability: | 60000 pieces per month | 
| 
                             Detail Information  | 
                    |||
| UnNominalworkingvoltage(Un): | 230/400V | UcMaxcontinuousoperatingvoltage(Uc): | 385VAC | 
|---|---|---|---|
| Nominaldischargecurrent(kA): | 20kA | Maxdischargecurrent(kA): | 40kA | 
| Protectionlevel(Up): | 1.8kV | Response Time(ns): | 25ns | 
| Installation: | 35mmslideguide | Workingconditions: | Temperature-40℃~+85℃; | 
Product Description
outdoor input in the building and each floor Low voltage(200/380VAC) industrial SPD
Model and specification  AM40A
| Model | AM40A | 
| MainTechnicalData | |
| UnNominalworkingvoltage(Un) | 230/400V | 
| UcMaxcontinuousoperatingvoltage(Uc) | 385VAC | 
| OperatingFrequency | 48-62Hz | 
| Nominaldischargecurrent(kA) | 20kA | 
| Maxdischargecurrent(kA) | 40kA | 
| ProtectedMode | L1,L2,L3,N-PE(4P) | 
| Protectionlevel(Up) | 1.8kV | 
| Recommendmaxbackupfuse | 63A(gL/gG) | 
| Responsetime | ≤25ns | 
| Work/Faultindication | Localindicatewindow: | 
| Green=SPDOK|White=SPDFailure | |
| Module | 4 | 
| MechanicalSpecification | |
| InstallationLocation | Indoor | 
| Installation | 35mmslideguide | 
| Dimension(mm) | 95*72*65 | 
| Cross-sectionalareamax | ≥25mm2 | 
| Cross-sectionalareamin | L/N:2.5mm2,PE:6mm2 | 
| Modeofconnection | Connectioninparallel | 
| EnvironmentSpecification | |
| Workingconditions | Temperature-40℃~+85℃; | 
| Relativehumidity≤95%;Height≤3km | |
| ProtectionLevel | IP20 | 
| Enclosurematerial | ThermoplasticmaterialUL94V-0 | 
 
Safety precautions: 
· When the SPDboxis installed in final system,it must achieve all therequirements of GB4943 (EN60950,IEC60950) standard;
· The equipment has to be installed by authorized professional person, before installation, to cut offpowersupply,and prohibit hot-line work from accidents
 Application: ·
Single phase power SPDis suitable forsystempowerprotection,such as power distributioncabinet,switch cabinet,switch cabinet,AC/DC distribution board, etc. · Distribution boxwith outdoor input in the building and each floor · Low voltage(200/380VAC) industrial and civilpowergrid ·Automationmachine room,power supply panel of converting station main control room![]()
Features: 
·Big discharger current capacity,lowresidualvoltage, quickresponse · Lowe leakage current and rate of change · Heat isolation technique, no fire disaster · Apply specigl shock fuse pieces, withhiahreligbility ·Build-inremote alarm connect point,easy toremote control · With power indicator to display working condition ·Equipped with lightning counter,exactly to record lightning stroke ·Temperature controlprotective circuit, built-in heat protection. automatic release unit Excellent international famous core component brand![]()
Installation:
· 35mm slide guide installation way · Connect +/-and ground terminal of power systemto+/-and ground terminalof SPD, then screw up the bolts · ground line of SPDto lightning protection systemground device · After wiring.please checkituntil everything isgoingwell, toput into operation.
 ![]()
Product maintenance:
·The eauipment has to be installed byauthorized professional person, before installation,to cut off power supply,and prohibit hot-line work from accidents · The sectional area of wire must reach technicaldemands · When the SPD box is installed in final system,it must achieve all the requirements of GB4943 (EN60950,IEC60950)standard; · The product does notneed to be maintained specially,but to inspect a fixed period · Afterthunderstorm season, it is normal that the indicator window is red, but to change a new module or total product instantly · Once there is afailure during systemoperation,please removethe SPD device at first,if the systemcan operate normally,the deviceis broken
 
Product standard
· GB18802.1low-voltage distributionsystemSP:performance demand and test method; · YD/T 1235.1 Communication Station low-voltage power system SPD technical requirement; ·YD/T 1235.2 Communication Station low-voltage power system SPD test method;
    
        

                        